de     en

EG-S-25EVV

Remove Sprue and Remove / Insert / Stock Parts

 
 

With our EG-S-25EVV you can use two separate positions for extraction and two different positions for deposition. Thus you can meet the following objectives:

  • Extract sprue and place it at position 1
  • Extract injection part and place it at position 2
  • Extract injection part and sprue and place them at two positions (injection part / position 1, sprue / position 2)
  • Extract two injection parts from two different molds and place them separately (part 1 / position 1, part 2 / position 2)
  • Take insert out of magazine, extract  injection part from mold, place insert in mold, place part at position 2

 

TECHNICAL DATA

 

EG-S-25EVV

 

axis

stroke / mm

description

drive

Vmax.

Z

0 - 600

Z-axis

pneumatical 6 bar

3 m/s

Y

200

Y-axis

pneumatical 6 bar

1 m/s

X

0 - 50

X-axis

pneumatical 6 bar

0,5 m/s

 

GRIPPER

  • mechanical gripper with spring reset
  • suction with venturi nozzle

CONTROL

  • controlled via injection molding machine or separate control (Siemens)

POWER SUPPLY

  • supply voltage 24 VDC
  • compressed-air supply 6 bar
 
back...

Contact

Dürrschmidt GmbH
Biberberger Straße 25 a
89284 Pfaffenhofen
 
phone: 0 73 02 / 91 91-52
fax: 0 73 02 / 91 91-54
Email: info@duerrschmidt-gmbh.de